Seattle Public 学校

诺瓦高中

樱桃街2410号.
Seattle, WA 98122
关于新星
Office Hours: 8:30 a.m. - 4 p.m.
Office Phone: 206-252-3500
Fax: 206-252-3501

新星 School Profile

Alternative Learning Experience School

新星是一所由公共教育监督办公室授权的另类学习体验学校. 新星项目致力于以学生为中心的教育. 学生选择他们的课程,并直接参与制定他们的时间表. 在课堂上和通过自主学习合同, 学生可以跟随自己的激情,同时创造独特的个人方式来展示他们的学习.

School Leadership and Board District

Community Partners at 新星 Community resources and programs at 新星


Continuous School Improvement Plan (C-SIP)

诺瓦高中 C-SIP

学校持续改善计划(C-SIP)是每所学校的行动计划 它确定了学校在当前和即将到来的学年计划重点关注的领域, the performance goals they want students to achieve, 以及学校计划如何合作实现这些目标.

这些计划会定期更新,以反映每所学校正在使用的策略. 这个文件也可以作为我们的标题I学校全校范围内的改进计划.


School and Building Reports

学校报告

诺瓦高中 Report

学校报告显示了一个学校学术发展的简要快照, 学生气候, 问责制, family and staff engagement, and overall school performance. 学校报告由州公共教育监督办公室为该州的每个学校和地区制作,并在全年定期更新数据.

On state assessments, students who are expected to participate but do not, such as absences or opting out, are counted as non-proficient. This may affect the school’s overall proficiency rating.

问题 about school reports? Contact the Research and Evaluation Department research@apostles-today.net.

School Climate Survey

诺瓦高中 Climate Survey

学校气候调查用于改善学校水平, climate surveys are given to all staff, students and families each year. The staff and student surveys are given to respective groups in person at schools; the family survey occurs in the spring.

建筑历史

新星 建筑历史 and Information

霍勒斯·曼学校被列入西雅图历史保护地标名单. 访问城市网站查找有关地标地位的信息.  

Asbestos Hazard Emergency Response Act (AHERA)

由指定人员每六个月对新星大楼内已知的石棉进行监测,以评估含石棉建筑材料的状况。. 6个月的评估结果由地区保存.

As required under AHERA, 诺瓦高中必须保持石棉管理计划(AMP),并将其存档在学校. AMP可在周一至周五的上课时间进行审查. For additional information, please contact:

温迪时装
Environmental Health and Safety Manager
wjcouture@apostles-today.net
206-252-0528


Discipline Dashboard

As part of Seattle Excellence, Seattle Public 学校’ Strategic Plan, 该地区致力于中断不合比例的纪律做法. 支持这项工作,提高透明度和问责制, 该学区为每所学校创建并发布了面向公众的纪律指示板,并于11月1日发布, 2021.

纪律仪表板数据反映了当前学年,并将在整个学年每季度更新一次. 如有任何疑问或疑虑,请联系具体学校的学校领导.

学年: Current academic school year.
Accessible/Default:点击这里切换到仪表板的可访问版本.
行动 by Month:按月份和开除类型划分的纪律处分次数.
行动: Count of disciplinary actions for an exclusion type.
属性:学生属性(性别,种族/民族,所服务的特殊教育,504计划)
: Count of exclusion days for an exclusion type.
天 of Exclusion: Count of exclusion days.
纪律率:至少有一次违纪事件的学生人数除以所有在校生人数.
E. 驱逐: Count of emergency expulsions for a student attribute.
登记: Count of enrolled students.
Exclusion 行动: Count of exclusionary actions for a student attribute.
排除天: Count of exclusion days for a student attribute.
排除类型: Short-term suspension (SS), Long-term suspension (LS), Emergency expulsion (EE), In-school suspension (IS), 驱逐(特异), and Interim alternative education setting (IA).
Exclusionary 行动: Count of exclusionary actions.
驱逐: Count of expulsions for a student attribute.
FERPA合规: Family Educational Rights and Privacy Act Compliance. *
Incidents by 一天 of Week: Count of disciplinary actions by day of week.
Incidents by Grade: Count of disciplinary actions by grade.
Incidents by Hour: Count of disciplinary actions by hour.
Incidents by 排除类型: Count of disciplinary incidents for an exclusion type.
Incidents by Student 属性 or Support Service: Count of disciplinary incidents. 有多少学生参与其中,事故就会被计算多少次.
Incidents per 100 学生:违纪事件数除以在校生数,再乘以100. 有多少学生参与其中,事故就会被计算多少次.
: Discipline rate for an exclusion type.
学校的名字:学校名称.
学生:至少有一次违纪事件的学生人数.
悬浮液: Count of suspensions for a student attribute.
武器:涉及武器的纪律事件数目.

*请注意:当一个小组少于10名注册学生时, 至少两个最小组的所有值都将被抑制.

新星 Levy Projects

咳嗽四世

霍勒斯·曼建筑是一所历史悠久的地标性学校,建于1903年. 1968年,它作为小学关闭,从1970年到2014年,它开设了其他课程. 最初的设计计划包括学校北部的一个附加部分, 但直到现在, it was never constructed. It opened as the location for 诺瓦高中 in 2015.

利维批准 : 2013

预算 : $12,641,000 (includes multiple funding sources)

Project Description

The project, completed in Feb. 2015, included seismic and modernization improvements to the 33,000-square-foot existing building and a 15,在该物业的北侧建造了占地5000平方英尺的侧翼.

The modernization included complete mechanical, electrical and plumbing upgrades, new exterior siding, refurbished windows, interior finishes and technology improvements. 还讨论了地震安全、生命安全和无障碍(ADA)的改进.

为重新配置的停车场区域增加了一个额外的车辆入口,并安装了雨水花园,以改善雨水排放.

关于咳嗽

卓越建筑(BEX)资本征费用于资助现代化或更换老旧建筑物的项目, fund technology for student learning, 处理整个地区的地震和安全问题以及主要的预防性维护需求.

BTA二世

In 2004, Seattle voters approved the BTA二世 capital Levy. 该基金资助了该地区每所学校近700个设施改善项目和技术升级. 

  • 2007 新的科学室,外部装修,曼恩的机械升级

BTA我

The $150 million Buildings, 科技及学术/体育(BTA我)资本征款于一九九八年二月获投票通过. BTA我在该市的每所学校资助了超过465个大小设施项目. The projects included safety and security upgrades, 更换屋顶和窗户,技术和运动场升级.

  • 2004 : Reroof, Fire Alarm, Exterior Restoration, Art & Science, Waterline Replacement at Mann

对BTA

这些建筑, 技术和学术(BTA)资本税支持该地区的长期计划,以升级和翻新老化的学校设施,并解决入学人数增长问题.

The BTA我V Capital Levy was approved by voters in 2016. 正规买足球的App将从2017年到2022年获得这些税收基金.

在新星注册